通过对工期与造价集成计划的建立、优化和实施步骤的研究,探索一种比较完善的集成管理方法,可以同时兼顾项目的进度、造价两个目标,在它们之间寻求协调平衡,以追求建设项目经济效益的最终实现。
Discussion and Analysis on Integrate Plan of Engineering Cost and Construction Period
Wang Xiuqin, Lin Feng
(Nanyang Normal University, Nanyang, He′nan\ 473061, China)
Abstract:The intension of integrate plan of engineering cost and construction period is analyzed based on earning value method. Through the studying of setting_up, optimization and implementation step of the integrate plan, a more perfect integrate management method is explored. This method can consider two goals of progress and cost of the project at the same time, and seek coordinate between them to pursue the realizing of the economic benefits finally.
Key words:engineering cost; construction period; dialectical relationship; integrate plan